Sunday 26 January 2014

26th January 2014

The weather as we are all know over the last couple of weeks has been somewhat wet so I spent the day finishing off the onboard electrics, everything is waterproof and designed for low temperature as I've used arctic cable.

There are three 4' fluorescent tubes, all on independent switches, plus two bulk head lights.  There is a 25M four way extension cable, plus a 10M one in a waterproof box.  All in all quite a good days work.

Sunday 19 January 2014

19th January 2014

After a bit of a break over Christmas as the Trust was closed and I also needed to work out what I needed tarp wise, the side tarps are now in place.  I've quite pleased with the frame and the covering tarps, even after all the wind and rain we have had recently its stood without any problems and the old girl is nice and dry inside.


Next week I'll install the guttering on the out edge, which was a request from the trust to prevent the rain run off from damaging what is left of the tarmac in the yard.  Getting the guttering to follow the shape will be interesting, but I'm hoping to use a heat gun to melt it slightly so it will follow the contours.